Saturday, July 20, 2013
Well it is Saturday morning the second day of getting the boat ready for the trip. Yesterday I replaced the electric bilge pump. I added 30 feet of chain to the anchor rode for increased safety for anchoring when we anchor out. One of the biggest projects I did was when they built the boat Bristol did not use the same color wire for the positive and negative wires on all the cabin lights, and when I connected the batteries the LEDs did not work on all lights so I had to redo the wiring on many the lights. Today I am picking up the engine and installing it with Rich Terry and Peter. We are also putting in the manual bilge pump and doing several other small projects. Rich is dropping off his gear for the trip on the boat so that it gets shipped with the boat. Tommrow Jeff Gardner is coming down to help get the boat ready and dropping off his gear.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment